Conducting a Pre-Construction meeting with our Client and the repair Contractor, to discuss final project controls and coordination.
Providing part-time construction inspections to monitor the Contractor's compliance with the Contract requirements and specifications.
Quality assurance testing, such as water testing wall assemblies or repaired areas, if needed.
Written and photographic documentation of the repair project, as it is being performed.
Performing a Substantial Completion or "punchlist" inspection of the completed repair project. After the Contractor performs "punchlist corrections", if required, we typically perform a Final Completion Inspection.